Case Studies

Proven Monitoring Outcomes on Complex Sites

A selection of completed programmes drawn from our project history: from LiDAR and BIM-ready point clouds to structural and envelope documentation on complex sites.

56 Mary Street, Mango Hill, external LiDAR
ResidentialMango Hill, QLD2026 programme

56 Mary Street, Mango Hill, external LiDAR

External LiDAR survey to capture the three-dimensional form of a proposed residential development site, with outputs tailored for Revit-based design work.

Challenge

The development team required a defensible external "shell" of the site and built form context ahead of detailed design, with data that would ingest cleanly into Autodesk Revit.

Solution

Oculus attended site for LiDAR capture across the external scope nominated by the client, completed registration and processing, and issued registered point cloud deliverables in .rcp (or the client’s preferred equivalent) for Revit.

Outcome

The project team received consistent reality-capture data for early design and stakeholder communication without rework between survey and modelling disciplines.

Sensors Deployed

Terrestrial LiDARExternal envelope and site captureRevit-ready point cloud
41 George Street, student accommodation
ResidentialBrisbane CBD, QLD2025 programme

41 George Street, student accommodation

Ground-floor LiDAR survey to support student accommodation works in the Brisbane CBD.

Challenge

Dense urban frontages and active foot traffic require rapid, well-planned capture windows while still achieving complete coverage of the ground plane.

Solution

Oculus scoped a ground-floor LiDAR programme with pragmatic mobilisation and registration suited to a tight city site.

Outcome

The delivery team received an accurate ground-level spatial record for coordination with building services and structural interfaces.

Sensors Deployed

Terrestrial LiDARGround floor captureUrban site programme

Planning a New Site?

Share your project scope and we can recommend a practical monitoring strategy before works begin.

Discuss Your Project